Stick Pack Machine Price and ROI Guide

Updated October 2026

Build an installed-cost budget and assess payback from your product, output and operating records.

Plain stick packets of different sizes beside a glass bowl of beige powder
Plain stick packets in different formats beside a bowl of powder. Open full-size image

Plain stick packets of different sizes beside a glass bowl of beige powder

A stick pack machine price depends on scope; missing dosing, format or site costs can leave the project underfunded. LINEVO does not publish a fixed price for this project scope: the amount must come from a dated configuration quotation. This guide helps you turn that quotation into an installed budget and a buyer-specific payback calculation. Unknown costs stay unknown until supported by a quote, site estimate or production record.

Inputs to collect before calculating a return
InputTypical value or conditionWhy it matters
InvestmentDated quote plus buyer site estimatesEstablish the full one-time funding requirement
Production basisAccepted sticks per period; product and format mixKeep current and proposed operations comparable
Operating costsStaffing, material use, utilities and maintenance recordsSeparate measurable savings from assumptions
DemandVolume required or supported by sales planningExtra capacity alone is not a cash benefit
On this page

What changes a stick pack machine quotation?

Define what the equipment must handle before comparing amounts. A powder, a free-flowing granule and a viscous gel can require different dosing arrangements. Finished stick dimensions, film, requested good output and format changes also belong in the specification. The stick pack machine family is the starting point for LINEVO’s published configurations.

Configuration variables to keep beside every quoted amount
VariableRecord for your projectBudget question
Product and doseProduct description, fill amount and behavior at filling conditionsWhich dosing and product-feed equipment is included?
Finished stick and filmDrawing or samples, film specification and every required formatWhich forming parts and change parts are supplied?
Output and lane arrangementRequired accepted sticks per shift, shift length and format mixWhat configuration and acceptance conditions support this requirement?
Cleaning and product contactCleaning method and product-contact requirementsWhat access, parts and cleaning work are in the offered scope?
Requested functionsCoding, inspection, dust extraction or gas flushing, where neededWhich functions are included, optional or buyer-supplied?

Public manufacturer documentation shows why scope matters: IMA’s STICK Series description distinguishes dosing configurations, optional check-weighing and downstream integration. Those are examples of separate equipment functions, not LINEVO specifications or a basis for assigning a price premium. Use the existing quote-scope comparison guide to reconcile individual supplier inclusions.

How do you build the installed project budget?

Add the quoted equipment and the one-time costs needed to put that agreed scope into service. Keep a single currency, valuation date and responsibility list. An excluded item needs an owner and a separate estimate; an empty cell is not a zero.

Buyer-filled installed-budget worksheet; enter amounts only when supported
Budget lineAmountEvidence and boundary
Quoted machine, dosing and first formatUnknown until quotedSupplier quotation, revision, currency and included items
Additional formats and requested optionsUnknown until quotedIdentify each option; exclude any already in the machine subtotal
Product feed and downstream handlingUnknown until scopedFeeder, collection, counting or cartoning; identify supplier
Delivery and import-related chargesUnknown until destination and terms are confirmedTransport, insurance and applicable destination charges; avoid overlap
Site preparation and utility connectionsUnknown until site reviewBuyer estimate for layout, connections and any required alterations
Installation, training and agreed acceptance workUnknown until responsibilities are confirmedAgreement, attendance scope, travel and test-material responsibilities
Start-up materials and initial partsUnknown until plannedFilm and product consumed before normal production, plus agreed parts
Loose silver stick packets beside an open kraft carton containing stick packets
Loose stick packets beside an open carton of packets. Open full-size image

Loose silver stick packets beside an open kraft carton containing stick packets

Decide where the finished product leaves the project: loose sticks, counted groups or loaded cartons. Price the equipment and labor needed to reach that same endpoint in both alternatives. The installation and training outline helps frame start-up responsibilities; it does not establish an installation fee or make that service part of every machine offer.

Installed investment I = equipment acquisition + separately funded one-time project costs. Count each item once. Record recoverable taxes separately from nonrecoverable charges using your finance team’s treatment. Keep working-capital needs visible in a separate funding line unless the investment model explicitly includes them.

Which operating costs belong in the comparison?

Compare the cost of delivering the same quantity of accepted sticks, in the same products and finished packaging. Record the time window and where costs begin and end. A cost-per-stick figure for loose packets cannot be compared directly with one that includes retail cartons.

Operating-cost record for the same production period
Cost itemCurrent operationProposed operation
LaborPaid hours by task and actual labor costExpected staffing, cleaning, replenishment and packing tasks; validate
Film and packagingTotal material cost consumed, including scrapFilm, cartons and other materials for the same output; validate yield
Product loss or overfillMeasured product issued and accepted filled outputTrial or production evidence under the proposed dose conditions
Utilities and consumablesSite metering or attributable usage and ratesSupplier requirements plus site rates; estimate separately if unmeasured
Maintenance and serviceParts, planned work and service recordsQuoted parts and a maintenance plan; unknown until supported
Changeovers and stopsRecorded time and its actual economic effectExpected schedule and observations; do not assume all downtime disappears
A group of intact silver stick packets beside crumpled silver film offcuts
Intact stick packets and crumpled film offcuts arranged separately. Open full-size image

A group of intact silver stick packets beside crumpled silver film offcuts

Operating cost per accepted stick = total operating cost for the period ÷ accepted sticks for that period. Include material spent on rejects in the numerator and exclude rejected packs from the denominator. If reject material is already in total consumption, do not add the same scrap cost again.

For a proposed line, label unmeasured consumption and output as assumptions. A sample test can address agreed product, film, dose and sealing questions. A short observation is not an annual reliability record. Keep its run conditions and the limits of what it measured.

How do you calculate payback without overstating savings?

For an initial screen, compare the installed investment with annual net cash benefit relative to the stated alternative. The baseline might be your current process or continued contract packing; it must deliver the same sellable output and packaging scope.

Annual net cash benefit B = annual avoidable cash costs of the baseline − annual cash operating costs of the proposed operation + separately justified incremental contribution. If no extra sales are supported, leave incremental contribution out. Use contribution after the extra costs of those sales, never gross sales revenue.

Simple payback in years = I ÷ B, where I is the installed investment and B is a positive, steady annual net cash benefit. If B is zero or negative, there is no finite positive payback on that basis. If benefits vary by year, track cumulative annual net cash flows until they recover I rather than dividing by one favorable year.

Removing a manual task is not automatically a payroll saving. Count reduced paid hours only when the staffing plan supports them; otherwise describe redeployed time as a capacity benefit. Likewise, unused rated capacity earns no sales contribution. Do not count the same labor saving both in lower operating costs and as another benefit.

A simple, undiscounted project ROI over a stated horizon can be defined as (cumulative net operating cash benefits over that horizon − I) ÷ I × 100%. Label that definition and horizon explicitly. It is not annual accounting ROI. State how taxes, financing, residual value and working capital are handled; the screening formulas here exclude them unless you deliberately add them to a consistent cash-flow model.

Payback alone omits the time value of money and the value of benefits after recovery. The Department of Energy-hosted webinar, Energy Cost Control: How the Money Works discusses these limitations. Use your organization’s finance method for the final investment decision, particularly when comparing alternatives with different useful lives.

What would make the investment case fail?

Test the assumptions that determine annual cash benefit. Use a conservative case based on the lower supported demand and less favorable supported operating conditions, then compare it with your central plan. Do not attach probability labels or savings percentages without evidence.

Sensitivity review before approving the purchase
UncertaintyChange in the conservative caseDecision to record
Demand or operating hoursUse less of the available capacityCan required output and cash benefit still be supported?
Accepted output and rejectsUse the lower supported output or higher observed lossesDoes the period cost per accepted stick still fit the plan?
Product and format mixAllow the cleaning and changeovers your schedule requiresIs expected output based on a realistic mix?
LaborRetain tasks that the staffing plan does not removeWhich benefits are cash savings and which are released time?
Start-upAllow the site work and ramp-up identified in the project planIs funding available before steady production begins?

If the proposal only works when every unknown takes its most favorable value, gather evidence before treating the return as established. First reconcile the equipment scope; then improve the demand, staffing and operating assumptions that actually change the result.

Method, sources and boundaries

Updated October 15, 2026. The budget and operating tables are buyer preparation worksheets, not market price data or a LINEVO performance forecast. They require your quotations, site estimates, demand plan and production records. No equipment price, percentage saving or payback period is claimed for a LINEVO configuration.

The equipment discussion uses LINEVO’s published family and service scope plus the manufacturer documentation linked above. The financial discussion uses elementary cash-flow arithmetic and the payback limitations in the linked government-hosted webinar. External manufacturer features do not establish what LINEVO supplies. The photos depict packaging objects; they are not records of a customer installation, acceptance test or measured waste result.

Prepare a configuration quotation

For a quotation discussion, send the product and fill amount, finished stick drawing or sample, film information, required accepted output and shift pattern, format mix, downstream endpoint and destination. Mark any unresolved input. Discuss your stick pack project on WhatsApp.